EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
wcooper
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (179)
Air Conditioning
- (10)
Avionics
- (15)
Brake System
- (3)
Cabin Cover
- (7)
-
Section 43: Cabin...
-
Section 43: Cabin Cover
-
Section 43: Cabin Cover
-
Section 43: Cabin Cover
-
Section 43: Cabin Cover
-
Section 43: Cabin...
-
Section 43: Cabin Cover
Doors
- (22)
Electrical
- (8)
Empennage
- (16)
Engine
Engine Cowl
- (1)
Fiberglass
- (1)
Firewall
Flight Controls
- (13)
Fuel System
- (4)
Fuselage
- (32)
Hangar
- (5)
Inspection
- (2)
Interior Finish
- (11)
Landing Gear
- (2)
Lighting
Paint
- (2)
Propeller
- (1)
Registration
- (1)
Research
- (3)
Training
- (8)
Tools
- (4)
Wings
- (3)
Workshop
- (2)
LCP
- (1)
Builder Name:
William Cooper
-
Project:
Vans - RV-10
-
VIEW REPORTS
Total Hours:
29.5
Total Flight Time:
Total Expense:
$175687.69
Start/Last Date:
Jan 29, 2019 - No Finish Date
Engine:
Lycoming YIO-540-D4A5 RT(Y)
Propeller:
Hartzell C2YR-1BFP/F8068D
Panel:
Garmin
Friendly URL:
https://eaabuilderslog.org?s=wcooper
Home or Last Project Picture
May 04, 2023
Section 43: Cabin Cover Part 4
Category: Cabin Cover
Finished match drilling the F-10107 backing strips. Then had to trim some of the overlap at the bottom aft corners. After that I set the cabin top back on the fuselage to get back to work on the doors.
Cabin Cover Backing Strips.png
IMG_2384.jpg
IMG_2386.jpg
IMG_2387.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.